Download Print this page

Xylem YSI DB600 Quick Start Manual page 2

Buoy

Advertisement

The DB600 requires the following basic assembly steps before deployment. A more customized system may require
additional steps; refer to the DB600 User's Manual as needed.
Install Deployment Tube
1
The deployment tube fits down through the top
of the buoy. Note the orientation of the side
bracket that prevents rotation of the tube in
the DB600.
Fit the locking collar to prevent the instrument
tube from lifting out of the top of the DB600. The
locking collar is fixed in position with the 2 x M8
bolt sets with locking nuts to prevent undoing
(Figure 2).
Mount the Ai1 onto the DB600 buoy
2
Use the two security pins supplied to connect the
bracket on the bottom of the Ai1 to the matching
bracket on the top of the DB600 (Figure 3). The pins
may be held in position with either:
The included split pins or
A user-supplied padlock for extra security
2
Figure 2: Fit the locking collar to prevent the deployment tube from
lifting out of the top of the DB600.
Figure 3: Use the security pin to connect the Ai1 to the top of the
DB600. A padlock may be used for extra security.

Advertisement

loading