[Operating Test] settings
does not work.
NOTE
The operating test is a step to verify the
PCS status for solar power generation and
battery charging / discharging.
It is recommended to proceed when the
battery SOC is more than 10 % and the
operating test menu is displayed.
You should perform 4 operating tests. To start
automatically.
You can also run tests separately by tapping
It is recommended to run all the tests at once
Charging (from Grid) :
The operating test for battery
charging through grid.
Charging (from PV) :
The operating test for battery
charging through PV.
Discharging:
The operating test for battery
discharging to grid.
Inverter :
The operating test for
converting PV' s DC power to AC
power.
The result is displayed when each test is
completed. When there is no problem with
displayed, tap each test result to display the
detailed information. Check and solve the error
referring to the error code in the information, and
perform the test again. For information on the
error code, refer to page 63.