Download Print this page

VENETA Smartfit Single Cell Honeycomb Blind How To Install page 2

Advertisement

How to install, operate and maintain your
Smartfit Single Cell Honeycomb Blind
Installation
continued...
Operating your
Blind
Maintaining your
Blind
Feedback?
We would love to know how you
went with your installation...
Please write a review on our
website at...
www.venetablinds.com.au
3
Attach Handle
Slide handle onto the top and bottom rails.
4
Install Blind
Please note all blind cords are interconnected.
Ensure the cords are not crossed or tangled.
Place Shoe Sliders into centre of Shoe Bases
and slide towards the outer edge of Shoe as
per diagram to the right.
5
Install Light Guard (optional)
The Light Guard is to be placed at the front and the back of the blind
at either side as per image.
Note: all 4 Light Guards are identical.
Note: try to leave a 2mm gap between the blind (bottom rail) and the
Light Guard to prevent scraping.
Note: use the double sided tape on the short side of the Light Guard
to attach to the window frame.
Place the front Light Guards in position and mark the edges with a pencil.
Remove the double sided tape and carefully place the Light Guard in position.
Place the rear Light Guards in position and mark the edges with a pencil.
Remove the double sided tape and carefully place the Light Guard in position.
Great Job... Enjoy your new Veneta Blinds!
Lower and raise the blind using the handles on the top and bottom rails.
Note the blind will close firmly at the top utilising the inbuilt magnets.
1
Dusting
Dust can be removed using a feather duster or vacuum with brush attachment on low suction.
2
Spot Cleaning
Use a warm damp cloth or a mild detergent for tougher stains.
Dab the affected area, but do not rub the fabric. Finish with just a warm damp cloth.
Allow the fabric to dry in the lowered position.
3
Ultrasonic
If ultrasonically cleaning the blind please specify that a mild solution must be used.
Note the rails should never be immersed in liquid.

Advertisement

loading