Transaxle Reinstallation (Eaton) - Bolens QS Series Service Manual

Table of Contents

Advertisement

DRIVE TRAIN (Continued)
QS, QT & 1900 SERIES
Page 3-30 REV. 4/83
----=---------------~-----------------------------------------------
8.
Install linkage on control shaft
and drive in roll pin to hold
in place.
9.
Install neutral adjusting rod
and torque all four bolts to
31 ft: lbs. (42 Nm).
10.
Install pick-up tube and tighten
packing nut.
11. Install the two hydraulic
oil lines and tighten packing
nul.
TRANSAXLE REINSTALLATION
EATON HYDRO MODELS
c.
Lay lock plate rod (E)
6.
Connect two hydraulic lines
on top of cross shaft
to hydro and filter.
1.
Position right and left hand
(G).
brake rods on inside of
7.
Line up transaxle to frame
frame rails.
D.
Slide drive shaft onto
and install the four axle
2.
Slowly roll transaxle be-
hydro shaft.
mounting screws (t). Torque
to 60ft. lbs. (81 N.m).
tween the two side frames.
3.
Install two top transaxle
At the same time position
mounting screws (F).
8.
Torque two top transaxle
the following:
bolts to 23ft. lbs. (30 N.m).
A.
Lay hydro control rod
4.
Connect hydro control rod
(D)
over
brake across
(D) to foot pedal arm with
9.
Instal! new hydraulic fluid,
-shaft (G).
clevis pin and cotter pin.
10 Qts. (9.5 liter).
B.
Direct hydro control
rod (D) toward arm
5.
Connect lock plate arm (E)
NOTE: A NEW OIL FILTER IS
(H).
to cross shaft arm.
RECOMMENDED.
j

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Qt series1900 seriesQs-16Qt-171966Qt-16

Table of Contents