3: Set Up Your mangOH Red
3.1 Peel Your mangOH Red
Open your mangOH Red kit and make sure you have all the parts—the mangOH Red kit typically includes:
•
(1) mangOH Red board with pre-installed CF3 module (WP76xx, WP77xx, WP8548, etc.)
Note: The module ships with Legato already installed. In this guide, you will install the latest mangOH Red approved build.
•
(2) module covers (for 2.5 mm and 4.0 mm height modules)—One pre-installed with the module, and one for
use with a CF3 module of a different height.
Note: The images used in this guide show the 4.0 mm cover.
Cover and 4.0 mm module
(e.g. WP8548, WP76xx)
•
(1) module cover release tool
•
(2) micro-USB cables
•
(1 or 2) Ultra Wide Band antennas (taoglas FXUB63)—2
•
(1) GNSS antenna (taoglas AGGBP.25B)
•
(1) micro-SIM card (Sierra Wireless, AT&T, or other provider)
•
(1) Breakout board (IoT expansion card format)
•
(2) M2 screws for IoT card installation
Important:
In this guide, your mangOH Red is powered by your computer. Going forward, a dedicated 2.5 A USB power
supply is recommended, since USB ports on many PCs and laptops may not provide sufficient current to power the
mangOH during high power bursts.
Rev 1 2020-03-01
Cover and 2.5 mm module
(e.g. WP77xx)
nd
antenna included if CF3 module supports diversity
7
3
41113734