Viessmann Vitoplex 200 Series Service Instructions Manual page 7

Type sx2a, 700 to 1950 kw oil/gas boiler
Table of Contents

Advertisement

Steps - commissioning, inspection and maintenance
Commissioning steps
Inspection steps
Maintenance steps
1. Commissioning the system...............................................................................................
2. Shutting down the system.................................................................................................
3. Opening the boiler door and cleaning cover...................................................................
4. Cleaning the turbulators, heating surface, flue outlet and flue pipe.............................
5. Checking all gaskets and packing cords on the flue gas side
6. Checking the thermal insulation components on the boiler door................................. 10
7. Inserting turbulators; securing the boiler door and cleaning cover............................. 11
8. Checking connections and sensor well on the heating water side for tightness
9. Checking the function of the safety equipment.............................................................. 12
10. Checking the function of the pressure switch................................................................ 12
11. Checking the temperature controller setting if a building management system is
used (DCC system)............................................................................................................ 12
12. Checking the expansion vessel and system pressure................................................... 12
13. Checking the firm seating of electrical plug-in connections and cable grommets
14. Checking the thermal insulation
15. Checking the water quality................................................................................................ 13
16. Cleaning the sight glass in the boiler door...................................................................... 14
17. Checking the mixer for ease of operation and tightness............................................... 14
18. Checking the function of the return temperature raising facility (if installed)
19. Checking the installation room ventilation
20. Checking the flue pipe for tightness
21. Adjusting the burner.......................................................................................................... 14
22. Instructing the system user.............................................................................................. 15
23. Operating and service documents................................................................................... 16
Commissioning, inspection, maintenance
Page
8
8
9
9
7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents