Steps - commissioning, inspection and maintenance
Commissioning steps
Inspection steps
Maintenance steps
•
•
•
1. Commissioning the system...............................................................................................
•
•
2. Shutting down the system.................................................................................................
•
•
3. Opening the boiler door and cleaning cover...................................................................
•
4. Cleaning the turbulators, heating surface, flue outlet and flue pipe.............................
•
•
•
5. Checking all gaskets and packing cords on the flue gas side
•
•
•
6. Checking the thermal insulation components on the boiler door................................. 10
•
7. Inserting turbulators; securing the boiler door and cleaning cover............................. 11
•
•
•
8. Checking connections and sensor well on the heating water side for tightness
•
•
•
9. Checking the function of the safety equipment.............................................................. 12
•
•
•
10. Checking the function of the pressure switch................................................................ 12
•
•
•
11. Checking the temperature controller setting if a building management system is
used (DCC system)............................................................................................................ 12
•
•
•
12. Checking the expansion vessel and system pressure................................................... 12
•
•
•
13. Checking the firm seating of electrical plug-in connections and cable grommets
•
•
•
14. Checking the thermal insulation
•
•
15. Checking the water quality................................................................................................ 13
•
•
16. Cleaning the sight glass in the boiler door...................................................................... 14
•
•
17. Checking the mixer for ease of operation and tightness............................................... 14
•
•
18. Checking the function of the return temperature raising facility (if installed)
•
•
•
19. Checking the installation room ventilation
•
•
•
20. Checking the flue pipe for tightness
•
•
21. Adjusting the burner.......................................................................................................... 14
•
22. Instructing the system user.............................................................................................. 15
•
23. Operating and service documents................................................................................... 16
Commissioning, inspection, maintenance
Page
8
8
9
9
7