Preparing The Door And Door Frame; Drill Fixture - Saflok Quantum ädesē RFID Installation Instructions Manual

Table of Contents

Advertisement

Quantum™ ädəsē
®
RFID Installation Instructions

Preparing the door and door frame

1. Prepare the door using the Quantum RFID reader installation template or drill fixture. The door edge
prep is a standard, full-mortise prep for a 1-1/4" x 8" front plate (1" x 8" and 1" x 7-3/4" custom front
plates are optional). The door surface holes and mortise are customized for the SAFLOK trim.
Important: Some holes are only on the inside surface of the door.
For new construction installations, the door manufacturer may prepare the door using the
installation template.
For retrofit installations, remove the existing hardware and confirm that the existing door edge
prep is appropriate for the SAFLOK mortise lock.
Drill fixture: If you are using a SAFLOK drill fixture, position and clamp the fixture on the door. The
fixture has two positioning posts that rest inside the mortise, establishing the proper backset for the
trim. When the fixture is clamped, its surfaces should be parallel with the door surfaces and door
edges. Not all holes go through the door (refer to the template). Notch the material on the inside
surface for easier routing of the motor wire. After machining, remove any debris from the mortise and
cutouts.
2. Prepare the door frame using the template and install the strike plate using the screws provided
(12 x 1-1/2 screws for wood frames, 12-24 x 3/8 screws for metal frames).
© SAFLOK™
INS_QTMADESERFID
Pg. 2 of 8
2/16/2012

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Quantum ädesē RFID and is the answer not in the manual?

This manual is also suitable for:

Quantum odyssey rfidQuantum odyssey

Table of Contents