3.1.3. Pole Mounting Procedure

The following figure illustrates the pole mounting option back-to-back.
Before starting the mounting procedure, check the pole diameter of the pole to which
the units will be installed.
Then, cut the thread-bolts (see table 3-2 Components of pole mounting kit, pos. 5) to
the required length according to the following table:
Pole-diameter (mm)
Length of thread-bolt (mm)
Length of cable bridge (mm)
(back-to-back)
Page 20
figure 3-4 Pole mounted units
100 110 120 130 140 150 160 170 180 190 200
216 226 236 246 256 266 276 286 296 306 316
table 3-1 Required length of thread-bolts
User's Manual for Node G
typical 1000; min 950
Network Elements
M0121A2A.doc