Download Print this page

LG ANEH033B1 Installation Manual page 9

Auxiliary heat control

Advertisement

Step 8. Connect power cable to terminal block.
Connect earth cable to heater panel.
3, 5, 8, 10 kW Heater
POWER INPUT
1 Ø 208/230 V 60 Hz
Step 9. Insert control box. Connect the three thermistors(CN_Pipe out, CN_Pipe in and CN_Room, CN_Out) , CN_EEV
and CN_Motor1 connector, Heater connector in control box. Waste the harness and replace new one. (CN_Motor)
The new harness is provided with the Electric Heater accessories. (It may vary depending on the model)
CN_Pipe in (White)
CN_Pipe out (Red)
Heater connector
Heater connector
Heater connector
Heater connector
Terminal Block
CN_EEV (White)
Terminal Block
Terminal Block
Terminal Block
CN_EEV (White)
CN_Motor1 (White)
CN_Motor1 (White)
CN_Motor1 (White)
CN_Motor1 (White)
NK
L1
L2
EARTH
(Multi V)
CN_Room (Yellow)
CN Out
CN Out
CN Out
CN Out
CN_EEV (White)
CN_EEV (White)
CN_Pipe in (White)
CN_Pipe out (Red)
Heater connector
Heater connector
Heater connector
Heater connector
15, 20 kW Heater
EARTH
L1
POWER INPUT 1
1 Ø 208/230 V 60 Hz
L3
L2
L4
POWER INPUT 2
1 Ø 208/230 V 60 Hz
EARTH
NJ
Heater connector
CN_Pipe in (White)
CN_Pipe out (Red)
(Single & Multi)
CN_Room (Yellow)
CN_Motor1 (white)
CN_Motor1 (white)
CN_Motor1 (white)
CN_Motor1 (white)
Assembly Diagram
(Single & Multi)
CN_Room (Yellow)
CN_Motor1 (white)
CN_Motor1 (white)
CN_Motor1 (white)
CN_Motor1 (white)
Installation Manual 9

Advertisement

loading

This manual is also suitable for:

Aneh053b1Aneh083b2Aneh103b2Aneh153b2Aneh203b2