Download Print this page

Daisy Below Ground Pool Cover Box Installation Manual page 2

Advertisement

Once trench dug to correct size and depth, place concrete slabs at each end where angle braces are located
4.
on the box (approx. 1000mm – 1200mm from end of box).
Level these slabs so they are approx. 512-515mm below the finished height of paving or concrete. Place
5.
spirit level on pool headers and lay across the trench propping the other end up so spirit level is level, using
the level measure down to slabs to obtain correct depth of slab, use rubber mallet to tape down to bed slab
in.
Once both slabs are in place and at correct level place blue metal or aggregate along the trench making sure
6.
you do not exceed more than 50mm above the slab height, for boxes with a centre brace or braces leave a
small amount out so brace doesn't touch the blue metal.
Once blue metal is down you are ready to place box into hole. Carry box to the trench edge, place rope or
7.
straps under each end of box and use these to lift and lower into hole.
With box in the hole and end braces are sitting on concrete slabs level box up to required height via the 4
8.
bolts inside the box, screw all 4 down so they touch the concrete slabs and then every 1 turn gives you
approx. 1mm of lift.
Daisy Pool Covers
Phone: 1300 55 18 11
hello@daisypoolcovers.com.au
daisypoolcovers.com.au

Advertisement

loading