Page 1
If you use power tools do not forget: 1. Wear eye protection. 2. Unplug equipment after use. ROUGHING-IN UNIT : mm 200436 ã , 2011 1172459-T01-A ã Copyright Kohler China Ltd., 2011...
Page 2
INSTALLATION Pre-installation preparations: Clean the drainage pipeline with water and ensure it is unblocked. Block the pipeline orifice with cloth to prevent blocking due to articles falling into the pipeline during installation. 1. Make sure the place to install the drain is the lowest point of the whole finished floor.
Page 3
6. Caulk the gap with cement and then clean the excessive cement. 7. Take out the cloth and the plastic cover after all the decoration and cleaning are finished. Shower Drain Body 3 8. Fix the drain body onto the plastic shell with silicon sealant.