Download Print this page

FWB multiBALL Setup Manual page 9

Advertisement

Step 6
Connect sensor cables
!
The plugs are equipped with a guide to ensure correct
connection. Make sure to gently find the guide before
pushing the plugs together and screwing them tight!
Multiball setup and connection plan
SX
LS1
TXZS1
SY
LS4
TXZS3
LS5
TXES2
LR1
RXZS1
RX
RX
RY
SX
SY
Lvx X
MB X
Lvx Y
MB Y
CAN/RS232
COM 1
HDMI
HDMI
HDMI
Computer
LAN
B.1-B.8 h
LS2
LS3
TXZS2
TXES1
TOP
LR2
LR3
RXZS2
RXES1
Calibration of the light grid:
Before the first power on after mounting the light bars to their final position put switch 3
(the array of tiny switches) up on both of the LVX-devices. Then Power on the System and
SEA
check that the green LED below the orange LED is lit. When interrupting a beam the green
light should go off. Check for both Axis X and Y. Then put down the switch 3 (to off). Now
EMA
the light grid is ready to use
Power
Power
Connect the light bars with each other. The open and labeled
plugs have to be connected to the sensor cables.
Use connection diagram!
Put all the cables into the Base Profiles. Any spare cable can
Projector
be arranged in the top Base Profile. To prevent the cables
from falling back out, bend the square flaps with a screw
driver to hold the cables in place.
RY
LR4
RXZS3
LR5
RXES2

Advertisement

loading
Need help?

Need help?

Do you have a question about the multiBALL and is the answer not in the manual?

Subscribe to Our Youtube Channel

Related Products for FWB multiBALL