G O M - 영 문
Standard Piping Diagram
All pipes should be inspected for leaks after assembly is completed to prevent any
defects or leaks.
All pipes other than the gas pipes should be insulated for prevention against freezing
after assembly is completed.
When connecting the pipes, after fixing the connections using the spanner, etc,
connect it to the pipes.
Distributor Specifications
- Less than 5 holes
- Over 6 holes
Distributor material
- Please use non- Corrosive material
- Do not use aluminum, carbon steel pipes, cast iron materials since they are easily
corroded.
Gas Meter Specifications
- 20,000 kcal/h or less : Over 3 level
- 25,000kcal/h
: Inner diameter of over 36mm
: Inner diameter of over 44mm
: Over 5 level
41
Need help?
Do you have a question about the KDB-161GOM and is the answer not in the manual?