ABB eCharger Series Manual page 30

Ac charging station for electric vehicles
Table of Contents

Advertisement

Available languages

Available languages

2. Preparing the floor mount kit
Before the floor mount kit is attached to the base, the front
door needs to be opened.
Opening the front door
Therefore, the sealing rod needs to be removed. There is a
threaded pin at the top of the closing rod. The closing rod can
be removed by tilting an Allen key SW 3.
Otherwise if the closing rod is stuck, unscrew the threaded pin
far enough so that it can be pulled using pliers. Once the
closing rod is removed, the door can be opened.
1 Closing rod
2 Threaded pin with hexagon socket, SW 3 (released)
3. Installing the floor mount kit
Place the floor mount kit on the concrete base and tighten the
bolts against the base plate.
1 nut M10, SW 16 or 17
2 washer M10
3 base plate
4 threaded pin or concrete anchor M10
IMPORTANT (NOTE)
Material for fastening is not included in the
scope of delivery. Before tightening please
check with a level if the pole is vertical. Correct
unevenness through underlays. Suitable
underlays are metal plates or other spacing
plates available from you retailer.
30 2CCF018900R0002-CH | AC Charger for Electric Vehicles, Model eCharger
Fig. 10: Preparing the pole
Fig. 11: Setting up and tightening the pole

Advertisement

Table of Contents
loading

Table of Contents