Ess System Settings - LG A005KEEN261 Manual

Energy storage system
Table of Contents

Advertisement

Operation
50

ESS system settings

3
y The following items can be set in the Settings tab:
- Operation Mode
- Backup SOC
- TOU setting
If the Operation Mode is TOU, it is operated by this
setting. (Charging and Discharging schedule can be
set one by one.)
- Grid Type
240 V AC and 208 V AC grid are supported
- Grid Profile
You can make detailed settings related to Rule21.
CAUTION
The grid profile must be set correctly. LG Electronics
does not accept liability for a missing or incorrect grid
profile.
If you are not sure which grid profile data set is valid
for your grid or purpose, contact your grid operator
for information on which grid profile data set is to be
configured.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

D007keen261

Table of Contents