Philips 107B10/05 Electronic User's Manual page 21

17" -inch (16.0" vis) color monitor
Table of Contents

Advertisement

Frequently Asked Questions
monitor to your Mac system. Please contact your dealer/reseller for details.
7.
What is TCO?
TCO is a Swedish abbreviation for the Swedish Confederation of Professional Employees.
8.
What is MPR?
MPR is a Swedish abbreviation for the Swedish National Board of Measurement and Testing.
9.
What are the differences between MPRII, TCO92, TCO95, TCO99 and TCO'03?
In the general hierarchy of standards, TCO'03/TCO99 is the highest level of certification. Next
is TCO95, which is "better" than TCO92, which, in turn, is better than MPRII. Below, we
compare the standards in each category.
-TCO 92 Phase out: June 30, 2000
-TCO 95 Will be end December 31, 2003
Emissions:
MPRII: Set low emission rules for visual displays.
TCO92: Imposed more stringent standards than MPRII.
TCO95: Further toughened TCO92 rules.
TCO99: Delineated even more severe standards and test procedures than TCO95.
TCO'03: Same as TCO99 standard + Testing uncertainty.
Safety:
MPRII: No requirement.
TCO92/95/99/03: All set requirements.
Energy Saving:
MPRII: No requirement.
TCO92: Standby mode < 30W, Off mode < 8W
TCO95: Standby mode < 30W, Off mode < 8W
TCO99: Standby mode < 15W, Off mode < 5W
TCO'03:Standby mode < 15W, Off mode < 5W
file:///D|/EDFU/crt_17/edoc/english/FAQ.HTM (2 of 12) [2003/11/3 ?? 01:01:18]

Advertisement

Table of Contents
loading

This manual is also suitable for:

107b10107b1099107b40107b437499107b5107b

Table of Contents