Installation Of Frp Retraction Tank; Before Beginning The Installation - Furuno CSH-53 Installation Manual

Color scanning sonar
Hide thumbs Also See for CSH-53:
Table of Contents

Advertisement

7. INSTALLATION OF FRP RETRACTION
TANK

7.1 Before Beginning the Installation

Note the following before installing the FRP tank:
• Use only the tank supplied.
• Follow the instructions in this chapter.
• If the owner of the equipment elects to use a shipyard-prepared FRP tank, FURUNO will
assume no responsibility for any damage caused by water leakage. In this case do the fol-
lowing:
• The finished surface of the tank flange must be within 0.5 mm of horizontal.
• Use sealant recommended by shipyard.
Table 7-1 Contents of FRP retraction tank installation kit
F
R
P
W
t a
T
r h
e e
N
a
m
e
R
t e
a r
i t c
n o
T
a
k n
S
r e
r p
o o
i f
g n
G
a
k s
t e
S
B
o
d n
S
a e
a l
t n
1 1
T
y
e p
C
o
e d
H
H
-
0 0
1 0
1 -
6
0 6
8 -
0 0
H
H
-
0 0
3 0
1 -
6
0 6
8 -
0 0
1 0
2
0 0
g
0
0 0
8 -
4 5
25
N
. o
Q
y t
0 -
1 1
1
0 -
1 3
1
1 -
1 0
1

Advertisement

Table of Contents
loading

Table of Contents