Dsfp Option For Cnc Ports; Locate The Sfp Transceivers; Install An Sfp Transceiver; Install A Qualified Sfp Option Into An Ds4200 Or Ds6200 Fc/Iscsi Controller Module - Lenovo ThinkSystem DS Series Hardware Installation And Maintenance Manual

Table of Contents

Advertisement

D
SFP option for CNC ports

Locate the SFP transceivers

Locate the qualified SFP options for your FC/iSCSI controller canister within your product ship kit. The SFP
transceiver (SFP) should look similar to the generic SFP shown in the figure below and in
When installing an SFP, refer to the 4-port or 2-port figure that corresponds to your product.
Canister face plate
Align SFP for installation
(plug removed/actuator open)
Figure 106 Install a qualified SFP option into an DS4200 or DS6200 FC/iSCSI controller module

Install an SFP transceiver

For each target CNC port, perform the following procedure to install an SFP. Refer to the figure above when
performing the steps. Follow the guidelines provided in
1. Orient the SFP for the target CNC port and canister position, and align it for insertion.
Depending upon whether the SFP is installed into controller A or B, it will either install right-side up, or upside
down.
2. If the SFP has a plug, remove it before installing the transceiver. Retain the plug.
3. Flip the actuator open (sweep up or down) according to the SFP position and alignment for canister slot 0A
(top) or 0B (bottom).
The actuator on your SFP option may look slightly different than the one shown, and it may not open to a sweep
greater than 90° (as shown in the figure above).
4. Slide the SFP into the target CNC port until it locks securely into place.
5. Flip the actuator closed (sweep up or down) according to its position in canister slot 0A or 0B.
The installed SFP should look similar to the position shown in the right detail view above.
6. When ready to attach to the host, obtain and connect a qualified fiber-optic interface cable into the duplex jack
at the end of the SFP connector.
156
SFP option for CNC ports
Target CNC port
Fiber-optic interface cable
"ESD precautions" (page 116)
Figure 107 (page
157).
Installed SFP
(actuator closed)
when installing an SFP.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents