The Bio Flame FIREBOX SS Installation Instructions Manual page 3

24”
Table of Contents

Advertisement

3. Continue building the wall, ensuring that there is a layer of cement board between the stud and your
Firebox on all sides.
4.First stud on either side of the Firebox must be flush with the Firebox and flange
5. Install a stud horizontally on top of the firebox to be able to continue with the wall.