Check After Installation; Test Operation - GREE ELECTRIC CVATI 09 Owner's Manual

Table of Contents

Advertisement

Available languages

Available languages

Check after installation

Check according to the following requirement after finishing installation.
Items to be checked
Has the unit been installed firmly?
Have you done the refrigerant leakage
test?
Is heat insulation of pipeline sufficient
Is water drained well?
Is the voltage of power supply according
to the voltage marked on the
nameplate?
Is electric wiring and pipeline installed
correctly?
Is the unit grounded securely?
Does the power cord follow
the specification?
Is there any obstruction in the air inlet
and outlet?
The dust and sundries caused during
installation are removed?
The gas valve and liquid valve of
connection pipe are open completely?
Is the inlet and outlet of piping hole
been covered?

Test operation

01
Preparation of test operation
The client approves the air conditioner.
Specify the important notes for air conditioner to the client.
02
Method of test operation
Put through the power, press ON/OFF button on the remote controller
to start operation.
Press MODE button to select AUTO, COOL, DRY, FAN and HEAT
to check whether the operation is normal or not.
If the ambient temperature is lower than 16
the air conditioner can't start cooling.
24
Possible malfunction
The unit may drop, shake or emit noise.
It may cause insufficient (heating) capacity.
It may cause condensation and water
dripping.
It may cause condensation and water
dripping.
It may cause malfunction or damaging
the parts.
It may cause malfunction or damaging
the parts.
It may cause electric leakage.
It may cause malfunction or damaging
It may cause insufficient (heating) capacity.
It may cause malfunction or damaging
the parts.
It may cause insufficient (heating) capacity.
It may cause insufficient (heating) capacity.
o
C ,

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents