Functional Verification - HP 82718A Service Manual

Hide thumbs Also See for 82718A:
Table of Contents

Advertisement

Installation
2-3
2-3.
Functional Verification
Tb verify the functional operation of the pod, do the following:
a. Press Iattn I. The HP-75 should turn on. If it doesn't, go to table 5-2.
b. Ifthe HP-75 turns on, go into the edit mode (press rEPirl). type in RUN "P" and press fWrNl. The
pod test program runs. (You will need to press IEDIT Itwice if this is a cold start.)
c. If the unit is good, various messages are displayed, and then "pod OK (nn)" is displayed, where nn
corresponds to the number ofK bytes ofinstalled RAM as indicated on the pod label. In case an error
message is displayed, refer to section 5 for analysis of the results.

Advertisement

Table of Contents
loading

Table of Contents