2.0 Installation

Ensure that the mains supply is isolated before proceeding
2.1 Decide on the position the fan is to be
sited; it must be a minimum of 2.3m from
the floor to the lowest point on the fan. (A
shorter 150mm long downrod is supplied
with the fan if required. Refer to the
section on installing the shorter downrod).
2.2 Stick a vibration damper on the
bracket of the J-hook. Fix the ceiling
J-hook (supplied) firmly to a timber joist or
concrete ceiling with the screws supplied
(or similar). Ensure that the fixing bracket
in the ceiling is able to support a hanging
weight of 15kg minimum. (Fig A)
2.3 Fit the three blades to the fan body.
(Fig B)
2.4 Hang the fan on the hook with the
safety wire, then hook up the fan on the
black rubber roller making sure that all
wires are clear.
2.5 Connect supply wires to the fan
using the terminal block at the top of the
downrod. (Fig C, next page)
2.6. Secure upper canopy with screws fitted to cover the wiring connections.
2.7 Tighten all screws including the earth connections.
2.8 Switch on supply and check fan function.
Fig. B
FAN BLADE
Fig. A
J-HOOK
SAFETY
WIRE
SCREWS
MOUNTING SCREWS
CEILING JOIST MUST
BE ABLE TO
SUPPORT A
MINIMUM OF 15kg
THE SURFACE MUST
BE HORIZONTAL
RUBBER ROLLER
UPPER CANOPY
(SHOWN BROKEN)
DOWN ROD
FAN BLADE
SPRING WASHERS
FAN BLADE
MOUNTING GASKET
FAN MOTOR BODY
EN
3

Advertisement

loading