Soap water method
1. Remove the caps from the 2-way and 3-way
valves.
2. Remove the service-port cap from the 3-way valve.
3. To open the 2-way valve turn the valve stem
counterclockwise approximately 90°, wait for about
2~3 sec, and close it.
4. Apply a soap water or a liquid neutral detergent on
the indoor unit connection or outdoor unit
connections by a soft brush to check for leakage of
the connecting points of the piping.
5. If bubbles come out, the pipes have leakage
Evacuation
1. Connect the charge hose end described in the
preceding steps to the vacuum pump to
evacuate the tubing and indoor unit.
Confirm the "Lo" knob of the manifold valve is
open. Then, run the vacuum pump.
The operation time for evacuation varies with
tubing length and capacity of the pump. The
vaccum pump must be operated less than
0.5torr of the gage pressure.
2. When the desired vacuum is reached, close the
"Lo" knob of the manifold valve and stop the
vacuum pump.

Finishing the job

1. With a service valve wrench, turn the valve stem of
liquid side valve counter-clockwise to fully open the
valve.
2. Turn the valve stem of gas side valve counter-
clockwise to fully open the valve.
3. Loosen the charge hose connected to the gas side
service port slightly to release the pressure, then
remove the hose.
4. Replace the flare nut and its bonnet on the gas
side service port and fasten the flare nut securely
with an adjustable wrench. This process is very
important to prevent leakage from the system.
5. Replace the valve caps at both gas and liquid side
service valves and fasten them tight.
This completes air purging with a vacuum pump.
The air conditioner is now ready to test run.
Air Purging and Evacuation
Cap
Hexagonal
wrench
Hexagonal
Hexagonal
wrench
wrench
Outdoor unit
Manifold valve
Open
Vacuum pump
Indoor unit
Vacuum
gauge
Lo
Hi
Open
Installation Manual 47