Download Print this page

ABB Battery cabinet for PowerValue 11-31T 10-20 kVA User Manual page 8

Advertisement

8. Re-insert all the cabled battery trays inside the unit by using the
correct shelf how described on the chapter 3 (Electrical drawing).
(fig. 7 and fig. 8)
9. Connect all the shelf's together how described on
the chapter 3 (Electrical drawing). (fig. 10)
10. Re-assemble all the 4 metallic bars on the unit.
(fig 9)
Modifications reserved
Page 8/12
Fig. 7
Fig. 9
Fig. 8
Fig. 10

Advertisement

loading