2 Installation

− PARALLEL BATTERY CABINETS OR UPS INTERNAL BATTERIES MAY
− MAKE CERTAIN ALL DISCONNECT DEVICES OF INSTALLED
WARNING!
For a correct installation and cabling of the battery cabinet, please follow step by step the instructions
described below:
1. Remove the two side and upper panel covers from the unit. (fig. 1)
2. Remove the 4 metallic bars (2 per side) that are locking the plastic battery trays. (fig. 2)
Fig. 1
Modifications reserved
Page 6/12
PRESENT VOLTAGE AT TERMINALS OF A BATTERY CABINET UNDER
SERVICE. MAKE CERTAIN ALL POLES OF THE BATTERY CABINET
DISCONNECT DEVICE ARE OPEN BEFORE UNDERTAKING INTERNAL
SERVICE ACTIVITY.
BATTERIES ARE OPEN BEFORE CONNECTING OR DISCONNECTING
AN ADDITIONAL BATTERY CABINET TO BATTERY VOLTAGE BUS'.