Download Print this page

Huawei SDongleA-03 Quick Manual page 2

Hide thumbs Also See for SDongleA-03:

Advertisement

Set inverters' Management System and 4G/GPRS parameters.
2.
Item
Parameter
NMS server
Parameters
for
NMS server port
connecting
to the
manageme
nt system
SSL encryption
APN mode
Identification type
APN
SIM card
parameters
APN dialup number
(4G/GPRS)
APN user name
APN user password
PIN
When connecting inverters to a third-party management system, you need to ensure that the
third-party management system supports the standard Modbus TCP protocol and configure the
access point table based on the definitions of Huawei inverter interfaces. You need to set NMS
server and NMS server port for inverters as required by a third-party management system and
replace the client certificate. A third-party management system must comply with the definitions
of Huawei inverter interfaces. You need to obtain inverter interface definitions from Huawei
technical support. This document describes how to connect inverters to a Huawei management
system.
Installing the Dongle
2.3
• Before installing the Dongle, you need to remove the Bluetooth module or USB data cable.
• Each inverter has only one USB port. When maintaining an inverter locally, you need to
remove the Dongle. In this case, the communication between the inverter and the network
management system is interrupted. After the local maintenance is complete and the Dongle is
installed, the communication is automatically restored.
1. Install a SIM card.
NOTE
• You need to prepare a standard SIM card (size: 25 mm x 15 mm; capacity: ≥ 64 KB). When
connecting to Huawei Hosting Cloud, prepare a SIM card based on the traffic requirements in
the following table.
• Before installing a SIM card, you need to remove the Dongle from an inverter.
Monthly Traffic Requirement of SIM Cards
10 MB + 4 MB x Number of
Inverters
inverters
With power
3 MB x Number of power
meters
meters
With the weather
3 MB x Number of weather
station
stations
2. Install the Dongle.
Inverter USB port
LED
Color
Status
N/A
Off
Yellow (blinking
Steady on
green and red
simultaneously)
Green
Blinking in a 2-second
cycle (on for 0.1s and
then off for 1.9s)
Blinking at long
intervals (on for 0.1s
and then off for 0.1s)
Steady on
Blinking at short
intervals (on for 0.2s
and then off for 0.2s)
Red
Steady on
Blinking at short
intervals (on for 0.2s
and then off for 0.2s)
Blinking at long
intervals (on for 1s and
then off for 1s)
Blinking red and
green
Blinking at long
alternatively
intervals (on for 1s and
then off for 1s)
Deploying Plants in a Remote Management System
2.4
Using the FusionSolar App
Log in to Google Play and search for
FusionSolar or scan the QR code to
download and install the app. The app
version is 2.3.5 or later.
• The following describes how to set the
FusionSolar app (2.3.5) on the Android UI.
1. Register a management system account. If a management system account exists, skip this step.
2. Enter the account and password to log in to the FusionSolar app, and create a plant.
3. On the Plant tab page, select the corresponding plant to view the device status.
Performance Parameters
Basic Parameters
Installation Mode
Indicator
Dimensions (W x H x D)
Net Weight
Ingress Protection Rating
Typical Power Consumption
SIM Card Type
Operating Temperature
Relative Humidity
Storage Temperature
Standard and Frequency Band
SDongleA-03-CN
SDongleA-03-EU
SDongleA-03-AU
SDongleA-03-JP
SDongleA-03-KR
Certification
SDongleA-03-CN
SDongleA-03-EU
SDongleA-03-AU
SDongleA-03-JP
SDongleA-03-KR
FAQ
How Do I Set Export Limitation Parameters?
Set export limitation parameters for the master inverter.
SUN2000-(3KTL–20KTL) as the master inverter: Log in to the FusionSolar app as installer, and
choose Device maintenance > Energy control > Grid-tied point control > Active power to
set related parameters.
A commercial smart inverter as the master inverter: Log in to the SUN2000 app as Advanced
User, and choose Settings > Grid-tied Point Control > Active power control mode to set
related parameters.
What Should I Do If Slave Inverters Cannot Be
Connected In the Cascading Scenario Where a
Commercial Smart Inverter Functions as the Master
Inverter?
Ensure that the RS485 communications cable is securely connected to the slave inverters.
Log in to the SUN2000 app as Advanced User, choose Settings > Comm. Parameters >
RS485, and ensure that the RS485 parameter of the slave inverters is set correctly.
Log in to the SUN2000 app as Advanced User, choose Settings > Comm. Parameters >
Management System, and ensure that Cascading channel of the slave inverters is set to
Description
• Huawei management system: Retain the default value
intl.fusionsolar.huawei.com.
• Specifies the IP address or website of a third-party management
system.
• Huawei management system: Retain the default value 27250.
• Specifies the port number of connecting inverters to a third-party
management system.
Set this parameter to
connected to Huawei management system.
Set this parameter to
connected to a third-party management system. If this
parameter is set to
and the management system is not encrypted, which poses
security risks.
• Set the parameters related to the SIM card. The parameters are
obtained from the SIM card carrier.
• When APN mode is set to Automatic by default, APN, APN
dialup number, APN user name, and APN user password are
not displayed. When APN mode is set to Manual, APN related
parameters are displayed. You can set the parameters.
Device performance data can be refreshed
every 5 minutes.
The Dongle logs, inverter logs, and IV diagnosis
data can be exported monthly. The Dongle and
inverters can be upgraded monthly.
Install the SIM
card in the arrow
direction.
Remarks
Normal
Normal
Abnormal If the duration is longer than 1 min, the
Normal
Abnormal If the duration is longer than 30s, the settings of
Normal
Abnormal Dongle is faulty. Replace Dongle.
Plug-and-play (applicable to inverters only)
LED
130 mm x 48 mm x 33 mm
90 g
IP65
3.5 W
Standard SIM cards (25 mm x 15 mm)
–30ºC to +65ºC
5% RH to 95% RH
–40ºC to +70ºC
LTE FDD: B1, B3, B8
LTE TDD: B39, B40, B41 (38)
DC-HSPA+/HSPA+/HSPA/UMTS: B1, B5, B8, B9
TD-SCDMA: B34, B39
GSM/GPRS/EDGE: 900 MHz, 1800 MHz
LTE FDD: B1, B2, B3, B4, B5, B7, B8, B20
WCDMA/HSDPA/HSUPA/HSPA+: B1, B2, B5, B8
GSM/GPRS/EDGE: 850 MHz, 900 MHz, 1800 MHz, 1900 MHz
LTE FDD: B1, B2, B3, B4, B5, B7, B8, B28
LTE TDD: B40
WCDMA: B1, B2, B5, B8
GSM: 850 MHz, 900 MHz, 1800 MHz, 1900 MHz
LTE FDD: B1, B3, B8, B18, B19, B26
LTE TDD: B41
WCDMA: B1, B6, B8, B19
LTE FDD: B1, B3, B5, B7
WCDMA: B1
SRRC
CE
Taiwan, China: NCC
Australia: RCM
TELEC, JATE
KC
(default value) when the device is
or
when the device is
, the data exchange between inverters
Traffic Support
Ensure that the Dongle
shell is properly
installed.
LED
Description
The Dongle is not secured or is not powered on.
The Dongle is secured and powered on.
Dialing (duration < 1 min)
4G/GPRS parameter settings are incorrect.
Reset the parameters.
The dial-up connection is set up successfully
(duration < 30s).
the management system parameters are
incorrect. Reset the parameters.
Successfully connected to the management
system.
The inverter is communicating with the
management system through the Dongle.
The Dongle has no SIM card or the SIM card is
in poor contact. Check whether the SIM card
has been installed or is in good contact. If not,
install the SIM card or remove and insert the
SIM card.
The Dongle fails to connect to the management
system because it has no signals, weak signal,
or no traffic. If the Dongle is reliably connected,
check the SIM card signal through the APP. If
no signal is received or the signal strength is
weak, contact the carrier. Check whether the
tariff and traffic of the SIM card are normal. If
not, recharge the SIM card or buy traffic.
No communication with the inverter
Remove and insert the Dongle.
Check whether inverters match the Dongle.
Connect the Dongle to other inverters.
Check whether the Dongle or the USB port
of the inverter is faulty.
FusionSolar
NOTE
This section describes how to
create a site on the FusionSolar. If
the inverter is connected to a third-
party management system, create
a site on the corresponding
management system.
Verify the mailbox and
activate the account.
Google Play
.

Advertisement

loading