Gc 1, Gc 3, And G891 Ignition Attempt Sequence For Retrials; Gas Valve And Expansion Tank; Expansion Tank; Gas Valve Conversion - Lennox G21Q3-40 Unit Information

Hide thumbs Also See for G21Q3-40:
Table of Contents

Advertisement

GC 1, GC 3, and G891 NORMAL IGNITION SEQUENCE
ON
É É
É É
OFF
É É
THERMOSTAT DEMAND
PURGE BLOWER
GAS VALVE
IGNITION SPARK
IGNITION TRIAL
1 − Thermostat demand for heat.
2 − Purge blower is energized.
3 − At 30 seconds gas valve and ignition spark are energized for
eight seconds.
4 − When ignition occurs (sensed by flame rectification), the
spark and purge blower remain energized for the remainder
of the 8.0 seconds (GC1, G891, and later GC 3 controls with part

GC 1, GC 3, AND G891 IGNITION ATTEMPT SEQUENCE FOR RETRIALS

É É
É É
ON
OFF
É É
É É
THERMOSTAT DEMAND
PURGE BLOWER
GAS VALVE
IGNITION SPARK
IGNITION TRIAL
1 − Thermostat demand for heat.
2 − Purge blower is energized.
3 − At 30 (30 + 2 GC 1, 30 + 5 GC 3 and G891) seconds gas valve
and ignition spark are energized for 8 seconds.
4 − If no ignition is sensed, purge blower continues to run.
5 − After additional 30 seconds (GC 1 and G891) (25 seconds
GC 3), ignition retrial takes place for another 8 seconds.
6 − If no ignition is sensed, purge blower continues to run for
G − Gas Valve and Expansion Tank
(Figure 23)
1 − Gas Valve
Gas valves used on G21/GSR21 series units have vari
ous opening times. All gas valves are internally redun
dant to assure safety shutoff. If replacement is neces
sary, the valve must be replaced with the same type of
valve. For example, replace a White Rodgers as shown
in figure 23 with a White Rodgers valve.
2 − Expansion Tank
An expansion tank downstream of the gas valve ab
sorbs back pressure created during combustion to pre
vent damage to gas valve diaphragm.
0
É É É É É É É É É É É É É É É
PRE PURGE 30 SEC.
É É É É É É É É É É
É É É É É É É É É É É É É É É
É É É É É É É É É É
GC 3 TIMINGS (SEC.)
38
GC 1 / G891 TIMINGS (SEC.)
38
0
30
É É É É É É É É É É É É É É É É É É É É É É É É
É É É É É É É É É É É É É É É É É É É É É É É É
É É É É É É É É É É É É É É É É É É É
É É É É É É É É É É É É É É É É É É É
É É
É É
É É
1
GC 1
GC1
38
GC3
30
É É É É É É É
É É
É É É É É É É
É É
1
GC 1
GC 3
numbers 97H02 and 52J18). Early GC 3 controls, with part
number 72H68 de energizes spark and purge .5 seconds after
flame is sensed or after 8.0 seconds if flame is not sensed.
5 − At end of heating demand, gas valve is de energized and purge
blower is started.
6 − Post purge continues for 30 seconds after heating cycle, then
is de energized.
FIGURE 21
63
71
96
104
68
76
106
114
É É É
É É É
É É É
É É É
É É É
É É É
3
2
GC 3
another 30 seconds (GC 1 and G891) (25 seconds GC 3).
7 − This sequence is repeated for five trials; without ignition the
control locks out until reset at the thermostat.
8 − With ignition occurring at any trial, the ignition spark and
purge blower remain energized for the duration of that trial
(GC 1, G891, and later GC 3 controls with part numbers
97H02 and 52J18) or are de energized after .5 seconds if
flame is sensed (Early GC 3 with part number 72H68).
FIGURE 22
3 − Gas Valve Conversion (Figure 24)
A gas changeover kit is available to convert A.G.A. / C.G.A.
natural gas units to LP gas. Refer to the instructions provided
in each specific kit for proper installation procedures.
A.G.A. / C.G.A. GSR21 ( 50, 80) units are shipped with the
components required for field conversion to LP gas.
Page 24
(Timings Nominal)
POST PURGE 30 SEC
ONDS
É É É É É É É É É
É É É É É É É É É
END OF HEATING DEMAND
(Specific Timings)
129
137
162
170
144
152
182
190
RESET AT
É É
É É
THERMOSTAT
BY BREAKING
É É
É É
DEMAND
É É
É É
4
5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents