Table 11
Boiler dimensional data (see Figure 40)
Boiler
Supply
Return
model
(in. NPT)
(in. NPT)
GV–3
1
GV–4
1
GV–5
1
GV–6
1
Note 1 Gas piping from meter to boiler to be sized per local utility requirements.
Table 12
Boiler ratings
Boiler
AGA Input
model
Btuh
number
GV-3
70,000
GV-4
105,000
GV-5
140,000
GV-6
175,000
Notes:
1. Based on standard test procedures prescribed by the United States Department of Energy. Ratings also referred to as AGA/
CGA Output.
2. Net I=B=R ratings are based on net installed radiation of sufficient quantity for the requirements of the building and nothing
need be added for normal piping and pickup. Ratings are based on a piping and pickup allowance of 1.15. An additional
allowance should be made for unusual piping and pickup loads.
Boilers are tested for 50 lbs working pressure. GV boilers are not available for millivolt systems.
Part number 550-141-850/0699
Length
Gas
L
connection
size
(in. NPT)
(inches)
1
30¾
1
30¾
1
37¾
1
37¾
DOE Heating
Net I=B=R
capacity Btuh
ratings Btuh
(Note 1)
(Note 2)
61,000
53,000
92,000
80,000
122,000
106,000
153,000
133,000
Crate dimensions
(outside measurement, inches)
(Note 1)
Length
Width
½
33½
½
33½
½
33½
½
33½
DOE
Vent/combustion
Seasonal
air diameter
efficiency (%)
(inches)
87.5
87.3
87.2
87.0
Approx.
shipping
weight
Height
(pounds)
22
36
270
22
36
320
22
43
355
22
43
410
Boiler water
content
(gallons)
3
3.3
3
4.2
3
5.1
3
6.0
95