Weil-McLain GOLD GV 3 Series Manual page 57

Hide thumbs Also See for GOLD GV 3 Series:
Table of Contents

Advertisement

• Installation • Start-Up • Parts • Maintenance
Xb
Service and maintenance —
Table 4
(see following pages for instructions)
Inspect:
Service:
Start-up:
Check/test:
Review:
Part number 550-141-850/0699
Service and maintenance schedules
Service technician
• Any problems reported by owner
• Boiler area
• Air openings
• Flue gas vent
• Boiler heating surfaces
• Water piping
• Condensate drain system
• Lubricate blower motor
• Lubricate any circulators requiring oil
• Perform start-up per manual
• Check gas piping for leaks
• Check cold fill & operating pressures
• Check temperature mixing system
• Check/maintain components - vents,
limits, expansion tank, gauges, igniter
• Inspect & operate relief valve
• Review maintenance procedures with
owner
schedule
Owner maintenance
(see following pages for instructions)
• Check boiler area
Daily
• Check air openings
• Check pressure gauge
• Check boiler interior piping
• Check venting system
Monthly
• Check air vents
• Check condensate drain system
• Check relief valve
• Test low water cutoff (if used)
Periodically
• Clean vent termination/air intake
screens
• Oil blower motor
Every 6 months
• Operate relief valve
End of season
• Shut down procedure
57

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents