Place Boiler In Position - Weil-McLain GOLD GV 3 Series Manual

Hide thumbs Also See for GOLD GV 3 Series:
Table of Contents

Advertisement

IIe
22
GOLD GV Water boiler series 3 — manual
GOLD GV Water boiler series 3 — manual
GOLD GV Water boiler series 3 — manual
GOLD GV Water boiler series 3 — manual
GOLD GV Water boiler series 3 — manual
Prepare boiler —
Position boiler
place in position
After installing vent starter tee, inspecting (replacing if
necessary) the gas/air orifice and installing the high
altitude kit (if required), move the boiler near its position.
Figure 6 shows the boiler with the front and top panels
replaced. These panels may be left off if desired until the
installation has been completed.
Refer to Figure 6 for placement sequence:
, carefully rotate the boiler
Wearing heavy gloves
over onto its base rail legs.
Clip the shipping strap
boiler block assembly. Remove the skid and strap.
Attach the
jacket rear panel
#10 x ¾" screws provided in the accessory bag.
Boiler is heavy
sheet metal parts which may have
sharp edges
handling and take proper precautions
when moving. Failure to do so will
result in severe personal injury, death
or substantial property damage.
Part number 550-141-850/0699
securing the skid to the
as shown using (4)
and contains some
.
when
Wear gloves

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents