Electrical Connections - DITEC FACIL Installation And Maintenance Manual

Swing gates
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 10
4.

ELECTRICAL CONNECTIONS

GB
The electrical connections and starting of the FACIL3-3E
gearmotor are illustrated in the E2 control panel installation
manual.
Note: the FACIL3E gearmotor has an incorporated E2 type
control panel. A connection box should ideally be used for the
electrical connections of the system.
The electrical connections and starting of the FACIL3H gearmotor
are illustrated in the VIVAH control panel installation manual.
All right reserved
All data and specifications have been drawn up and checked with the greatest care. The manufacturer cannot however take any
responsibility for eventual errors, ommisions or incomplete data due to technical or illustrative purposes.
FACIL - IP1827
5.
MAINTENANCE SCHEDULE (every 6 months)
Without 230 V~ power supply and batteries if present:
-
Clean and lubricate the gate's rotation pins and hinges
with neutral grease.
-
Check the resistance of the fixing points.
-
Check the value of the capacity of the motor condenser.
Reconnect the 230 V~ power supply and batteries if present:
-
Check the power adjustment.
-
Check that all commands and safety functions are ope-
rating correctly (photocells).
-
Check that the release system is working correctly.
-
Check that the batteries are working correctly (in conti-
nuity) if the VIVAH control panel with BATK2 battery kit
is present, by switching off the power supply and perfor-
ming several manoeuvres. Once performed, turn on the
230 V~ power supply again.
WARNING: For spare parts, see the spares price list.
12

Advertisement

Table of Contents
loading

Table of Contents