Download Print this page

Toshiba TCB-DP22CUL Installation Manual page 8

Drain pump kit
Hide thumbs Also See for TCB-DP22CUL:

Advertisement

Available languages

Available languages

Drain Pump Kit
installation
Manual
[] Thermal insulating process
Apply thermal insulation to pipes at liquid and gas
sides separately.
• Be sure to use thermal insulator with heat
resisting temperature
248°F (120°C) or more for
pipes at gas side.
• Using thermal insulators attached to the indoor
unit and Elbow Piping Kit, apply thermal
insulating process surely to pipe connecting
section without clearance.
When fixing insulator to the elbow type pipe
temporarily with the banding band attached to
the Elbow Piping Kit, wrap the insulator using
vinyl tape so that there is no clearance.
CAUTION
Apply thermal
insulating process surely so that no
exposure cannot be found up to the end of the
pipe connecting section of the indoor unit.
(if a part of the pipe is exposed, leakage may be
caused.)
[]
How to install Drain Pump Kit
1. Mount the Drain Pump Kit fixture to the rear
side inside of the indoor unit. (1 screw)
I
,
Screwing of Drain Pump Kit fixture
_.
°
_Pump
Kit fixture
eX..._Jl,
"_
/
//_
Hang the temporary hanging hook of the Drain
Pump Kit to the side slit of the indoor unit from
inner side. Screw the Drain Pump Kit to the
indoor unit. (3 screws: Ceiling surface, side
face, and Drain Pump Kit fixture)
Fix with vinyl tape.
Set the notch upward.
/"
\ E,bow%o0K,ts,de
Banding band
Attached thermal insulating pipe
For the connection of refrigerant pipe and thermal
insulating process after hanging down the indoor unit,
refer to the Installation Manual attached to the indoor
unit.
Temporary hanging hook of Drain Pump Kit
to the side slit df indoor unit
Screwing (To side face)
Drain Pump Kit
Screwing (ToDrain Pump Kit fixture)
Screwing
Drain Pump Kit
(Toceiling surface)
English- 7
8

Advertisement

loading