GBD KUDA 150 Instructions For Installations

Electromechanical linear operator
Hide thumbs Also See for KUDA 150:

Advertisement

Quick Links

KUDA
KUDA 150 - (15000/DX-15000/SX)
KUDA 200 - (22000/DX-22000/SX)
Operatore elettromeccanico lineare
ISTRUZIONI PER L'INSTALLAZIONE
Electromechanical linear operator
INSTRUCTIONS FOR INSTALLATIONS
I
UK

Advertisement

Table of Contents
loading

Summary of Contents for GBD KUDA 150

  • Page 1 KUDA KUDA 150 - (15000/DX-15000/SX) Operatore elettromeccanico lineare KUDA 200 - (22000/DX-22000/SX) ISTRUZIONI PER L’INSTALLAZIONE Electromechanical linear operator INSTRUCTIONS FOR INSTALLATIONS...
  • Page 2 KUDA WARNINGS FOR THE USER In the event of an operating fault or failure, cut the power upstream of the control unit and call Technical Service. Ÿ Periodically check functioning of the safety devices. Any repairs must be carried out by specialised personnel Ÿ...
  • Page 3: Warnings For The Installer

    INTRODUCTION The KUDA operator for swing gates is an electromechanical device that transmits motion to the gate by means of a worm screw. It is locked when the motor is not running, it is necessary to install locks if fitted on blind/flush panel doors WARNINGS FOR THE INSTALLER Before proceeding with installation, fit a magnetothermal and differential switch with a maximum capacity of 10A...
  • Page 4: Technical Data

    KUDA TECHNICAL DATA Operator KUDA 200 KUDA 150 Type Irreversible electromechanical with worm screw Supply voltage 24 Vdc Power absorbed 100 W (~1000 N) Current absorbed 4 A (~1000 N) MAX Electric motor 24 Vdc 2600 rpm Useful travel 360 mm...
  • Page 5: Preliminary Warnings

    For proper functioning of the automated device, the existing or new gate structure must meet the following requirements: Ÿ The individual leafs must have a maximum length of 2 metres (KUDA 150) or 2,5 meters (KUDA 200) The leaf structure must be robust and rigid Ÿ...
  • Page 6: Operator Installation

    OPERATOR INSTALLATION 9 - Fix the front bracket to the leaf with a clamp fig.8b . 10- Use a spirit level to check that the operator is perfectly level. 11 - Remove the operator from the front and rear bracket . 12 - Fasten the front bracket .
  • Page 7: Maintenance

    KUDA MAINTENANCE Periodically check the gate structure, in particular: - Check functioning of the hinges; - Check that the leafs are correctly balanced. Excessive inclination of the leafs will result in faster wear of the operator fastening brackets. Do the test by unlocking the operator and checking that the leafs do not move on their own;...
  • Page 8 CE Declaration of conformity The manufacturer: GI.BI.DI. S.r.l. Via Abetone Brennero, 177/B, 46025 Poggio Rusco (MN) ITALY Declares that the products: ELECTROMECHANICAL GEARMOTOR KUDA 150-200 Are in conformity with the following CEE Directives: Directive 2006/95/CE and subsequent amendments; • •...
  • Page 9: Drawings And Diagrams

    KUDA KUDA 150 - (15000/DX-15000/SX) Operatore elettromeccanico lineare KUDA 200 - (22000/DX-22000/SX) DISEGNI E SCHEMI Electromechanical linear operator DRAWINGS AND DIAGRAMS...
  • Page 10 IMPIANTO TIPO / TYPICAL INSTALLATION 9 9 1 LEFT OPERATOR-MOTOR 2 RIGHT OPERATOR-MOTOR 1 OPERATORE SINISTRO-MOTORE 2 OPERATORE DESTRO-MOTORE 1 DIMENSIONI OPERATORE / OPERATOR DIMENSIONS 9 2 2 93mm 360mm 46mm KUDA 150 640mm 98mm 674mm 93mm 400mm 46mm KUDA 200 765mm 98mm 799mm...
  • Page 11 KUDA STAFFE / BRACKETS 9 9 3 Ø9 Ø9 APERTURA VERSO L’INTERNO / INWARD OPENING 9 9 1 9 9 4 150mm KUDA 150 MAX 120mm KUDA 200 MAX 150mm CHIUSURA / CLOSING...
  • Page 12 KUDA APERTURA VERSO L’ESTERNO / OUTWARD OPENING 9 9 1 9 9 5 Min 70mm APERTURA / OPENING QUOTE INSTALLATIVE / INSTALLATION DIMENSIONS 9 9 1 9 9 6 β° KUDA150 KUDA200 120 130 140 150 β>120° β>120° β<90° β<90°...
  • Page 13 KUDA STAFFA POSTERIORE / REAR BRACKET 9 9 7a 9 9 1 9 9 7a 9 9 1 9 9 1 9 9 7a 9 9 1 9 9 STAFFA ANTERIORE / FRONT BRACKET 9 9 8a 9 9 1 9 9 1 9 9 8b...
  • Page 14 KUDA MANOVRA DI SBLOCCO OPERATORE SINISTRO / LEFT MOTOR UNLOCK MANEUVER 9 9 9a 9 9 1 9 9 1 9 9 9b 9 9 1 9 9 9c 9 9 1 9 9 9d MANOVRA DI SBLOCCO OPERATORE DESTRO / RIGHT MOTOR UNLOCK MANEUVER 9 9 9e 9 9 1 9 9 1 9 9 9f...
  • Page 15 KUDA COLLEGAMENTI ELETTRICI / ELECTRICAL CONNECTIONS 9 9 10 9 9 1 Motore 1 / Motor 1 9 10 11 12 13 14 15 1 2 3 4 5 Motore 2 / Motor 2 9 10 11 12 13 14 15 1 2 3 4 5 COLLEGAMENTO ELETTROSERRATURA / ELECTRIC LOCK INSTALLATION 9 9 1 9 9 12...
  • Page 16: Istruzioni Per L'installazione

    PC200 PC200 - (AS06050) Apparecchiatura elettronica ISTRUZIONI PER L’INSTALLAZIONE Electronic control unit INSTRUCTIONS FOR INSTALLATIONS...
  • Page 17: Technical Specifications

    PC200 1 - TECHNICAL SPECIFICATIONS Control unit SC230 / AS05710 Electronic control unit for automation Type of a double swing gate with 24VDC motors Power supply 230 VAC single-phase 50/60 Hz No. of motors Motor power supply 24 Vdc Flashlight 24 Vdc 10W max Accessory power supply 12 Vdc 10W max...
  • Page 18 PC200 INSTALLAZIONE APPARECCHIATURA / CONTROL BOARD INSTALLATION 9 9 1 9 9 1...
  • Page 19 PC200 SCHEMA ELETTRICO / ELECTRICAL CONNECTIONS 9 9 1 9 9 3 9 9 1 9 9 2 PHASE NEUTRAL LED1 SYS-learn 24Vac 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 BAT 24V LED2 START-PED LED3...
  • Page 20 PC200 COLLEGAMENTO ALIMENTAZIONE / POWER SUPPLY CONNECTION PHASE NEUTRAL 230Vac INTERRUTTORE MAGNETOTERMICO INTERRUTTORE DIFFERENZIALE OVERCURRENT CIRCUIT BREAKER RESIDUAL-CURRENT DEVICE PHASE NEUTRAL COLLEGAMENTO MOTORE / MOTOR CONNECTION Motore 1 / Motor 1 9 10 11 12 13 14 15 1 2 3 4 5 Motore 2 / Motor 2 9 10 11 12 13 14 15...
  • Page 21 PC200 COLLEGAMENTO LAMPEGGIANTE / FLASHING LIGHT CONNECTION 24 Vdc 10W max 1 2 3 4 5 COLLEGAMENTO ELETTROSERRATURA / ELECTRIC LOCK CONNECTION 1 2 3 4 5 COLLEGAMENTO DISPOSITIVI DI COMANDO / CONTROL DEVICES CONNECTION 17 18 19 20 21 22 23...
  • Page 22 PC200 DIP SWITCH SW2_1-2 ( AU02000 ) 9 10 11 12 13 14 15 17 18 19 20 21 22 23 PHOTO1 ( AU01900 ) 9 10 11 12 13 14 15 17 18 19 20 21 22 23 PHOTO1 3 4 5 3 4 5 ( AU02000 )
  • Page 23 PC200 DIP SWITCH SW2_1-2 ( AU02000 ) 9 10 11 12 13 14 15 17 18 19 20 21 22 23 PHOTO1 ( AU01900 ) 9 10 11 12 13 14 15 17 18 19 20 21 22 23 PHOTO1 3 4 5 3 4 5 17 18 19 20 21...
  • Page 24 PC200 DIP SWITCH SW2_1-2 4 10 17 18 19 20 21 22 23 COSTA SAFETY EDGE ( AU02000 ) 9 10 11 12 13 14 15 17 18 19 20 21 22 23 PHOTO2 ( AU01900 ) 9 10 11 12 13 14 15 17 18 19 20 21 22 23...
  • Page 25 PC200 DIP SWITCH SW2_1-2 4 11 ( AU02000 ) 9 10 11 12 13 14 15 17 18 19 20 21 22 23 PHOTO1 ( AU01900 ) 9 10 11 12 13 14 15 17 18 19 20 21 22 23 PHOTO1 3 4 5 3 4 5...
  • Page 26 PC200 ESEMPI IMPOSTAZIONE TASTI RADIOCOMANDO / TRANSMITTER BUTTONS SET UP EXAMPLES 4 12 START START START START...
  • Page 27 PC200 CONFIGURAZIONI AVANZATE JUMPER JP3 / ADVANCED JP3 JUMPER CONFIGURATIONS 4 13 TRANSMITTER START START NOTE / NOTES...
  • Page 28: Installation Warnings

    PC200 3 - INSTALLATION WARNINGS • Before proceeding with installation, fit a differential magnetothermal switch with a maximum capacity of 10A upstream of the system. The switch must guarantee omnipolar separation of the contacts with an opening distance of at least 3mm. •...
  • Page 29: Protection Fuses

    PC200 5 - ELECTRICAL CONNECTIONS: CONNECTORS Terminal Position Description 0 VAC from transformer 24 VAC from transformer + Battery 24V - Battery 24V 6 - ELECTRICAL CONNECTIONS: TERMINAL BOARDS Terminal Position Signal Description LIT+ FLASHLIGHT power supply 24 VDC MAX 10W. LIT- FLASHLIGHT power supply 24 VDC MAX 10W.
  • Page 30: Warning Leds

    PC200 8- WARNING LEDs Position Colour Signal Description Short flash every second: at rest in one-motor mode. Double flash every second: at rest in two-motor mode. LED1 Long flash every second: during time learning. On fixed: gate travel learning procedure not executed or failed. Comes on when the START or PEDESTRIAN control is activated from the terminal LED2 START-PED...
  • Page 31: Dip Switch Sw2

    PC200 8 - DIP SWITCH SW1 Function Status Description Operation in response to the START command: → Ÿ Gate closed OPENS → Ÿ During opening STOPS STEP-BY-STEP → Ÿ WITH STOP Gate open CLOSES → Ÿ During closing STOPS → Ÿ...
  • Page 32 PC200 10 - DIP SWITCH SW2 Function Status Description Enables the water hammer function during opening to help electric lock release. Operation: at the START command, the following will occur in sequence: - electric lock activation; DIP 5 WATER HAMMER - closing pulse of 1 sec;...
  • Page 33 PC200 12 - TERMINALS 20 and 23 OPERATING MODE N.C. FRAME GATE STATUS EFFECT GATE CLOSED RELOADS THE PAUSE TIME GATE OPEN STOPS, INVERTS THE MOTION FOR 2 SECONDS, DURING CLOSING STOPS UNTIL RELEASE, THEN OPENS DURING OPENING STOPS, INVERTS THE MOTION FOR 2 SECONDS, STOPS UNTIL RELEASE, THEN CLOSES OPENING DEVICE GATE STATUS...
  • Page 34 PC200 DESRCIZIONE MENU ( A ) 14 - GATE TRAVEL LEARNING If using two motors, the DIP switch SW2_8 must be ON. If using only one motor, it must be connected to the terminals M1 and the DIP switch SW2_8 must be OFF. Intervention of any anti-crushing or START-PED command safety device during the learning phase results in the learning process being interrupted and exited and it will have to be repeated.
  • Page 35 PC200 EC Declaration of conformity The manufacturer: GI.BI.DI. S.r.l. Via Abetone Brennero, 177/B, 46025 Poggio Rusco (MN) ITALY Declares that the product: PC200 ELECTRONIC CONTROL UNIT is in conformity with the following EEC Directives: LVD Directive 2006/95/EC and subsequent amendments •...
  • Page 36 GI.BI.DI. S.r.l. Via Abetone Brennero, 177/B 46025 Poggio Rusco (MN) - ITALY Tel. +39.0386.52.20.11 Fax +39.0386.52.20.31 E-mail: info@gibidi.com Numero Verde: 800.290156 w w w . g i b i d i . c o m...

This manual is also suitable for:

Kuda 200

Table of Contents