Note that the Net
Tightening Cord
that is on top of
each Top End Cap,
is fully loosened
before inserting
Boom.
Step 5: Attach End Posts to Base
Take the Netting with one of the End Posts with the Boom already inserted and slide it down over the Vertical
Support of the Base. Rotate the base slightly until the End Post interlocks with the pin mechanism in the
Vertical Support. You will hear it click when it engages. Now do the same on the other side.
Step 6: Tighten Net & attach Center Net Support
Page 3 of 9
Need help?
Do you have a question about the SwiftNet and is the answer not in the manual?