Download Print this page

Pickle-ball SwiftNet Installation Instructions Manual page 2

Advertisement

Step 1: Open Carry Bag
Open the carry bag and remove the contents, and set them on the court for easy access.
Step 2: Open the Base Legs
Take one of the Carbon Fiber Base Legs, and fan it open around the Vertical Support on the Base. Place each
Base about one foot outside the sideline at the center of the court with the legs directed away from the
court. Open the legs to the maximum amount they can be separated as shown on the Vertical Support decal.
Leave the bases in the upright position.
Step 3: Unroll Netting
Unroll the Netting fully and place the bottom of each Post near each Vertical Support of each Base. Make sure
the Net Tightening Cord that is on top of each Top End Cap, is fully loosened and free.
Step 4: Assemble Shock Corded Tensioning Boom
Assemble the Boom fully into one long pole by inserting one section into the next until it is completely
assembled. The Boom is put together just like a tent pole. With the Netting and Boom lying on the ground,
insert one end of the Boom under the Net Cord and slide it into the receiving end of the Top End Cap on Post
located on either side of the netting. It is important to make sure the Net Cords are above the Boom before
you insert the Boom into the Top End Cap as otherwise the netting can get twisted. Do the same to attach the
Boom to the Top End Cap on the other side of the Netting.
Page 2 of 9

Advertisement

loading
Need help?

Need help?

Do you have a question about the SwiftNet and is the answer not in the manual?