IBM 8203-E4A Manual page 22

Control panel, control panel fillers, and signal cables
Hide thumbs Also See for 8203-E4A:
Table of Contents

Advertisement

Figure 13. Installation of a signal cable in a rack-mounted system
4) Route the signal cable to the front of the system, leaving extra cable length to the back of the
system.
5) Carefully form an S-shaped loop with the signal cable and tuck the loop into the open area at
the back of the system.
Desk-side signal cable installation
1) Carefully fold the signal cable (B) to match the folds on the signal cable that was removed.
2) Attach the signal cable to the port (A) on the back of the backplane.
3) Route the signal cable to the side of the system as shown.
4) Thread the signal cable through the clamp (H) and the clip (G).
5) Continue routing the signal cable to the front of the system, leaving extra cable length to the
side of the system.
14
Control panel, control panel fillers, and signal cables

Advertisement

Table of Contents
loading

Table of Contents