Youngman TTA02 Use And Care Instructions Manual page 23

Telescopic tower
Table of Contents

Advertisement

Step 5: Setting the Platform Height
Platform Height 2.00 Metres
7
Platform Height
Extend Rungs
Rung
3, 4, 5 & 6
1. Erect the Safety Cage as described on pages 8 to 10.
Refer to the diagrams on page 24 and 25.
2. Place your foot on RUNG 9 and lift RUNG 3 on the LEFT frame until locked.
3. Place your foot on RUNG 9 and lift RUNG 3 on the RIGHT frame until locked.
4. Place your foot on RUNG 9 and lift RUNG 4 on the RIGHT frame until locked.
5. Place your foot on RUNG 9 and lift RUNG 4 on the LEFT frame until locked.
6. Place your foot on RUNG 9 and lift RUNG 5 on the LEFT frame until locked.
7. Place your foot on RUNG 9 and lift RUNG 5 on the RIGHT frame until locked.
8. Place your foot on RUNG 9 and lift RUNG 6 on the RIGHT frame until locked.
9. Place your foot on RUNG 9 and lift RUNG 6 on the LEFT frame until locked.
10. Attach the Platform to RUNG 3 as described on pages 11 and 12.
11. See 'Fitting the Platform Stabilisers' described on pages 14 and 15.
12. Extend and lock a platform stabiliser above the rung containing the RED
bracket until RED shows in the viewing window in the stabiliser. Ensure it is
locked.
13. Place the stabiliser hook over the RED bracket and push down to lock it
in place.
14. Repeat steps (12) and (13) for each of the other platform stabilisers.
15. Fit the Toe boards as described on page 13.
16. Deploy the ground stabiliser legs as described on page 7.
youngmangroup.com
2.00m
23

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ttg02Tta02tbTtg02tb

Table of Contents