Step 5: Setting the Platform Height
Platform Height 1.00 Metre
3
Always Place Platform
at this Level
Rung
1. Erect the Safety Cage as described on pages 8 to 10. Refer to the diagram below.
2. Attach the Platform to RUNG 3 as described on page 11 and 12.
3. Fit the Toe boards as described on page 13.
4. Deploy the ground stabiliser legs as described on page 7.
youngmangroup.com
1.00m
HANDRAIL
LOCKED
RUNG 2
KNEERAIL
LOCKED
RUNG 4
RUNG 3
RUNG 5
RUNG 6
RUNG 7
RUNG 8
LOCKING
GATE
RUNG 9
HANDRAIL
HANDRAIL
LOCKED
KNEERAIL
KNEERAIL
TOE BOARD
PLATFORM
LOCKED
17