Graco Therm-O-Flow 55-H Instructions-Parts List Manual page 24

Heated supply unit with hydraulic-powered ram. 200 liter (55 gallon) drum size, 165 mm (6.5”) dual post
Table of Contents

Advertisement

Changing Empty Drums
6. Place the new drum in the ram:
a. Remove the cover from a drum of appropriate
material.
b. Remove any other packing from the drum, to
expose the material. Make sure that there are
no foreign objects on the material surface.
NOTE: Whenever drum changes are required, re-
move the cover from a drum of new material
by holding it level and lifting it straight up. Tip-
ping the cover may allow accumulated dirt to
spill into the drum, which may result in damage
to the equipment.
c. Place the drum under the raised follower plate.
d. Close the drum clamp. Make sure it is secure-
ly fastened around the drum.
7. Lower the follower into the drum:
a. Move the ram hand valve lever to the DOWN
position.
b. Check the drum position as the follower low-
ers. If necessary, stop lowering the follower
before contacting the drum, and adjust the
drum and/or clamp positions to align the drum
with the follower plate.
c. Continue lowering the follower. As the follower
enters the drum, loosen the air bleed stick.
Loosening the bleed stick allows trapped air
between the follower plate and the top of the
material to escape.
d. When air stops exhausting from the bleed stick
port, replace and tighten the bleed stick.
8. Adjust the ram pressure for normal operation.
24
310–534
Operation
(continued)
9. Bleed, from the material pump, the air that was
introduced during the drum change:
a. Place a waste container under the pump bleed
port.
b. Open the bleed port and turn on pump air
pressure.
c. Allow material to flow from the bleed port until
it is air-free.
d. Shut off air to the pump and close the bleed
port.
e. Turn air on to the pump and set the pump air
regulator for normal operation.
10. Resume normal operation.

Advertisement

Table of Contents
loading

Table of Contents