Pro-safe 31238165 Operation & Maintenance Manual page 12

Shelters
Table of Contents

Advertisement

1. On-scene coordinator should decide
shelters placement and the location of
the zipper door;
2. Pull the two doors need to be
connected closely (distance 10-20 cm).
Shelters should be in a straight line.
3. Roll up the zipper door and fasten it
by the door webbing.
4. Pull the Velcro flag off the door.
5. Locate
the
vertically which shows the center of
the flag. Connect the two Velcro
flags from this center point. Do the
connecting smoothly and avoid
wrinkles as far as possible.
6. line up the floor and connect the
floor Velcro smoothly.
stitching
line
11

Advertisement

Table of Contents
loading

Table of Contents