Pro-safe 31238165 Operation & Maintenance Manual page 10

Shelters
Table of Contents

Advertisement

overheated. Once the machine overheated and it will stop and should
work again once it cools down.
INFLATION USING HIGH PRESSURE COMPRESSED AIR:
NOTE!
valve, as the unit may burst!
Allow a steady, clean flow of air to inflate the unit. It will
take approx. 45 seconds to 5+ minutes to inflate the unit
(size of unit dependent) from an SCBA cylinder, and slightly longer if
using a compressor or the electric inflator/ deflator. Remove inflator /
deflator once unit is fully inflated.
NOTE! Support roof of shelter as it inflates! (helps unit stand)
With
on-scene
carefully attach hose to SCBA/dive air
cylinder and lock hose to air berm. Then turn
on cylinder air VERY slowly. Then inflate unit
until pressure relief valve operates - indicated
by sound of escaping air, which can be felt by
hand. IMMEDIATELY turn off compressed air
supply. The pressure relief valve will close
automatically when excess air has escaped
from unit.
Never cover/block the pressure relief
coordinator
oversight,
4.
After
shelter stands up,
pull
the
corners and the
floor flat.
the
four
9

Advertisement

Table of Contents
loading

Table of Contents