Installation Of Water-Proof Jacket - HIKVISION HiWatch DS-I112 Quick Start Manual

Network
Table of Contents

Advertisement

Network Bullet Camera·Quick Start Guide

Installation of Water-proof Jacket

2.3
It is recommended to adopt the water-proof jacket (supplied) for the
network interface when the camera is installed outdoor.
Steps:
1. If the network cable has been settled down, cut off the plug of the
network cable first.
2. Route the network cable through the following components in
sequence: fix nut, water-proof ring, and the main body of the
water-proof jacket, as shown in the figure.
3. Insert the water-proof ring into the main body of the water-proof
jacket, to increase the sealing ability of the components.
4. Wire the plug and network cables up.
5. Fix the O-ring to the network interface of the camera, and then
connect the network cables.
6. Wrap the network interface with the main body of the
water-proof jacket, and then rotate the fix nut clockwise to
assemble it to the main body of the water-proof jacket.
Network Interface O-ring
Plug Water-proof Jacket Water-proof Ring Fix Nut Network Cable
Components of Water-proof Jacket
17

Advertisement

Table of Contents
loading

Table of Contents