Advertisement

OPERATION, INSTALLATION & MAINTENANCE INSTRUCTIONS
OPERATION, INSTALLATION & MAINTENANCE INSTRUCTIONS
The SUNPAK, by TECHRITE Controls Australia. A wholly Australian owned company.
Victoria (Head Office)
12 Yiannis Court
Springvale VI C 3171
Phone 61 3 9549 4444
Fax 61 3 9546 6069
www.techrite.com.au
Authorised Distributor
Applied Climat e Cont rol
Aus t ralia W ide
Phone 1300 798 088
FOR THE SUNPAK S34 PATIO HEATER
FOR THE SUNPAK S34 PATIO HEATER
Techrite Controls Australia Pty Ltd
ABN 30 006 959 495
Email info@t echrit e.com.au
Website www.t echrit e.com.au

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the S34 Heater and is the answer not in the manual?

Questions and answers

Summary of Contents for Sunpak S34 Heater

  • Page 1 OPERATION, INSTALLATION & MAINTENANCE INSTRUCTIONS FOR THE SUNPAK S34 PATIO HEATER FOR THE SUNPAK S34 PATIO HEATER www.techrite.com.au The SUNPAK, by TECHRITE Controls Australia. A wholly Australian owned company. Techrite Controls Australia Pty Ltd Victoria (Head Office) Authorised Distributor 12 Yiannis Court...
  • Page 2 SUNPAK S34 Heater Manual © Techrite Controls Australia OPERATION, INSTALLATION & MAINTENANCE INSTRUCTIONS OPERATION, INSTALLATION & MAINTENANCE INSTRUCTIONS FOR THE SUNPAK S34 HEATER FOR THE SUNPAK S34 HEATER Table of Contents CONTENTS Page Description and Features • Sequence of Operation, Maintenance Trouble-Shooting •...
  • Page 3: Heater Features

    Automatic operation • Slim profile • SUNPAK is AGA certifi e d as a fluel e ss Decorative safety grille infrared heater sui t abl e for domestic and • commercial outdoor...
  • Page 4: Sequence Of Operation

    Limited Warranty and Service SUNPAK infrared heaters carry a 90-day commercial or one year residential li m ited factory warranty. All heaters are stamped w i t h the date of manufacture. In most cases, your deal e r or sal e s representati v e w ill handl e the warranty procedure for you.
  • Page 5 SUNPAK S34 Heater Manual © Techrite Controls Australia 430mm 430mm 1200mm (Minimum clearance 430mm 430mm to combustible materials) 600mm 600mm 1200mm (Minimum clearance to combustible materials) S34 WIRING DIAGRAM 430mm 430mm 600mm 600mm 1200mm (Minimum clearance to combustible materials) 1206mm...
  • Page 6 3.66m 30° Angle 2.44m 3.66m SUNPAK w ill raise t he comfort level 3 to 6°C out doors. The ANGLE MOUNTING above coverage t able w as based on still breeze conditions. U nder w indy condit ions, more heat w ill be The SU NPAK heat er may be angle mount ed t o a required.
  • Page 7: Installation

    2.6kPa v olume 200m3. 4. W hen inst alled out doors t his heat er must be in Sunpak heat ers must alw ays be operat ed in a a cov ered area protect ed from rain t er. locat ion t hat allow s uniform air pressure around t he heat er.
  • Page 8: Unit Clearance

    SUNPAK S34 Heater Manual © Techrite Controls Australia UNIT CLEARANCE The unit must hav e the following clearances from combustible materials: 430mm above and beside, 600mm at the sides ends and 1200mm below. This appliance shall only be used in an abov e ground open-air situation with...
  • Page 9 SUNPAK S34 Heater Manual © Techrite Controls Australia Last Update 4/2/2008...
  • Page 10 SUNPAK S34 Heater Manual © Techrite Controls Australia Last Update 4/2/2008...
  • Page 11: Lighting Instructions

    SUNPAK S34 Heater Manual © Techrite Controls Australia 2. Removal of TECHRITE AIS spark ignition control LIGHTING INSTRUCTIONS A) Disconnect 240 Volt pow er. To start the heater: Disconnect HT lead. Turn elect ricity supply ‘ON’ C) Disconnect tw o (2) v alv e leads.
  • Page 12 SUNPAK S34 Heater Manual © Techrite Controls Australia SUNPAK S34 Heater Manual TECHRITE CONTROLS AUSTRALIA ● IGNITION TRANSFORMERS & ● SOLENOID & CONTROL VALVES DEVICES ● REGULATORS, METERS & GAS ● COMMERCIAL & DOM ESTIC FILTERS CONTROLS ● INDUSTRIAL COMBUSTION ●...

Table of Contents