Scott VISION 2 RFF1000 Operating And Maintenance Instructions Manual page 6

Full facemask
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
VISION 2
Head Harness:
This should be checked for possible
failure, paying particular attention to the
anchor studs.
Fig. 2
The web head harness is stamped on the
outside centre, with a code indicating the
date of manufacture (see Fig. 2). The
number in the centre is the year of
manufacture and the dots around the
outside of the number indicate the quarter
of the year in which manufacture took
place. One dot = January to March, two
dots = April to June, three dots = July to
September and four dots = October to
December.
In the example shown in Fig. 2, the head
harness
was
manufactured
January and March in 2001.
Note:
Replacement intervals for components
marked with a date of manufacture
should be calculated from the date of first
use of the component and not the date of
manufacture.
RECORD INSPECTION AND
MAINTENANCE DETAILS
Record test and maintenance details on
the Inspection and Maintenance Record
Sheet provided at the back of this
Manual.
Information recorded usually includes:
SHELF LIFE OF COMPONENTS
O-Rings spares packs are marked with a
shelf life. DO NOT use O-Rings from
spares packs with a shelf life expiry date
that has passed.
Notes:
between
4
Name of employer responsible for
the apparatus.
Make,
model
identification mark of the apparatus,
together with a description of any
distinguishing features, sufficient to
enable clear identification.
Date
of
the
maintenance
together
name,
signature
authentication
mark
examiner.
Condition of the apparatus, details
of any defects found and any
remedial action taken.
Replacement
intervals
components
originating
spares pack marked with a shelf life
must be calculated from the date of
first use of the component and not
from the shelf life expiry date.
For
calculating
maintenance dates the 'date of first
use' is the date on which the end
user takes delivery of a complete
VISION
2
facemask
supplier. In the case of spares, it is
the date on which the replacement
component is fitted to the VISION 2
facemask.
number
or
inspection/
with
the
or
unique
of
the
for
from
a
periodic
from
the

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vision 2rff4000

Table of Contents