Installing The Boiler - Baxi Fourtech Series Operating And Installation Instructions

High performance gas-fired wall-mounted boilers
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 36
After deciding the exact location of the boiler, fix the template to the wall.
Connect the system to the gas and water inlets present on the lower bar of the template. Fit two G3/4 taps (delivery and
return) on the central heating circuit; these taps make it possible to carry out important operations on the system without
draining it completely. If you are either installing the boiler on an existing system or replacing one, as well as the above,
fit a settling tank under the boiler on the system return line in order to collect any deposits and scale circulating in the
system after flushing. After fixing the boiler to the template, connect the flue and air ducts, supplied as accessories, as
described in the following sections.
If the model 24 - 1.24 - 1.14 natural draught boiler is installed, connected it to the flue with a metal pipe resistant to normal
mechanical stress, heat, products of combustion and relative condensate.
Figure 4
WARNING
Carefully tighten the water connections to the nipples of the boiler (maximum tightening torque 30 Nm).
G"3/4 HEATING DELIVERY
G"3/4 HEATING RETURN
G"1/2 DOMESTIC HOT WATER OUTLET
G"1/2 DOMESTIC COLD WATER INLET
G"3/4 GAS INLET TO BOILER
INSTRUCTIONS FOR FITTERS
13. INSTALLAZIONE DELLA CALDAIA

14. INSTALLING THE BOILER

24 F - 24
1.24 F - 1.24 - 1.14 F - 1.14
43
926.116.5 - en

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents