Ecom CP 400 Operating Instructions Manual page 15

Table of Contents

Advertisement

5. Apply pressure with the pump slowly until the switch opens.
Important NOTE: In the switch test mode the display update rate is increased to help
capture changing pressure inputs. Even with this enhanced sample rate pressurizing the
device under test should be done slowly to ensure accurate readings.
6. Once the switch is open, "OPEN" will be displayed, bleed the pump slowly until the
pressure switch closes.
7. At the top of the display it will now read, "SW OPENED AT" and give you the
pressure that the switch opened at.
8. Press the "NEXT" option to view when the switch closed, and the dead band.
46

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the CP 400 and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Cp 420

Table of Contents