Electrical Installation - DURAVIT DuraSystem Mounting Instructions

Toilet frame with manual odour extraction
Hide thumbs Also See for DuraSystem:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 6

Electrical installation

Power supply
Max. rated power
Circuit breaker
RCCB
DANGER
Risk of fatal electric shock
> Disconnect electrical components from the power supply
before the installation.
> Check that all components are de-energised.
> Prevent the power supply from being switched on
accidentally.
41
Installing the power supply for the SensoWash
shower toilet (optional)
> Install the power supply line according to the
technical instructions for the SensoWash
> Connect the power supply only when the shower
toilet is installed.
43
Pre-installation/planning
> Plan a position for the
• within 1700 mm (diagram I)
• outside the protection zones 0 – 2 (diagram II)
> Install a permanent power supply line there:
• Interconnect the switch (version A) or the time-
delay relay with the button/switch (version B)
• Install a separate circuit breaker and residual-
current circuit breaker (RCCB) upstream
• Connect all pole disconnector mains switches
upstream located outside the protection zones
0 – 2 (diagram II)
47
51
Mounting the installation set
> Position the concealed box at the designated
point.
61
64
Connecting the toilet frame
> Connect the supply line to the transformer.
®
.
®
concealed box:
100-240 V, 50-60 Hz
10 W
I
= 16 A
N
I
30 mA
N
I
B
S1
K1
A
S1
0
Circuit diagrams
A
S1
S1
K1
T1
T1
M
M1
M1
Version A
Version B
Safety areas in accordance with DIN VDE 0100-701
II
0
6 0
1
0
* or the height of the highest shower head
/ water outlet that is permanently installed,
depending on which is higher
0-1700
B
M
6 0
0
2
MAL_57154/17.10.1
7

Advertisement

Table of Contents
loading

Table of Contents