insTaLLaTion

PiT cHeck

1. Check entire dock leveler pit for proper construction
according to certified pit drawings (publication 5567).
Check to be sure that the pit walls are square and plumb.
Prep the pit floor for rear leveler legs. The pit should
be clean and free of any excess debris. Chip excess
concrete or large residual concrete flash left over from
pouring the pit. Area surrounding the leveling feet should
be smooth and free of excessive lumps. Check electrical
service running to the pit to assure it agrees with the
correct location and voltage for the junction box. Inspect
the pit and remove all loose trash and construction
debris. Verify the pit matches pit details for your leveler.
See the installation troubleshooting on page 14 if the pit
varies from the specification.

LeVeLer cHeck Prior To insTaLLaTion

1. Visually check that the 4 rear hinge pins and retaining
clips are in place.
2. Visually check that the lip shaft collars or shaft retainers
are in place on both lip rods.
3. Verify that both the lip support and the maintenance strut
have safety hitch pins on chains.
4. Visually check that the foot assemblies are in place.

PrePare siTe

Place barricades around pit on dock floor and drive while
installing, maintaining or repairing dock leveler.
Power to control box must be from fused disconnect
supplied by others. For correct fuse size refer to wiring
diagrams on pages 15-24 of this manual. Before doing any
electrical work, make certain the power is disconnected
and properly tagged or locked off. All electrical work
must be done by a qualified technician and must
meet all applicable codes. If it is necessary to make
troubleshooting checks inside the control box with the
power on, USE EXTREME CAUTION. Do not place fingers
or uninsulated tools inside the control box. Touching
wires or other parts inside the control box could cause
electrical shock, resulting in death or serious injury.
1. The control station, user's manual and dock bumpers
are attached to the subframe of the dock leveler. The
maintenance strut has a plastic tie wrap holding it to the
subframe, remove these it before placing the leveler into
the pit. Make sure the customer gets the user's manual
and is properly trained.
6
6004754F — HK and HK-S Hydraulic Dock Leveler, 3 Button — Safe
©2009 4Front Engineered Solutions, Inc.
2. Mount and wire push-button control station (See Fig.
2) and pit mounted receptacle (See Fig. 3). See wiring
diagram located on the inside cover of the control box or
wiring diagrams on pages 15-24 of this manual for wiring
information. Follow the wiring instructions to set control
for proper voltage. Wires show in dashed lines are field
connections.
3. If conduit must be installed (replacing an existing
mechanical dock leveler) do so at this time. Refer to the
conduit requirements on the pit detail publication 5567
and powered dock leveler wiring diagrams and typical
installation drawings, and powered dock leveler wiring
diagram on page 15-24 for electrical requirements.
Follow all applicable electrical codes and standards.
Fig. 2
48"
Fig. 3
Pit
center
line
10"
12"-13"
Box located as
shown
Push-button
control station
T
Frame
January 2009