Download Print this page

Honeywell EXCEL 5000 OPEN ZAPP Installation Instructions page 2

Hide thumbs Also See for EXCEL 5000 OPEN ZAPP:

Advertisement

ZAPP utilizes a free topology transceiver (FTT10A) Link
Power compatible L
W
ON
ORKS
chain, loop, and star network configurations or any
combination thereof.
Depending upon the L
W
ON
used, one or two termination modules may be required (see
Fig. 4). Different connections to the termination module are
necessary, depending upon whether it is used in a singly- or
doubly-terminated network configuration.
NOTES:
®
— The L
W
network is insensitive to polarity,
ON
ORKS
eliminating installation errors due to miswiring.
— For installations, try to avoid areas of high
electromagnetic noise (EMI).
Range of RF Transmission
Because of ZAPP's radio-frequency characteristics, it is not
possible to exactly define its transmission range.
The transmission range is comparable to that of cordless (not
cellular!) telephones, i.e. about 30 meters inside a building.
As a rule of thumb, the signals can travel through one wall
and one ceiling or through two walls.
It is recommended that you always first test ZAPP in the
actual environment in which it is to operate. Use LonMaker or
EXCELON in conjunction with nvoRfState.LastCommand to
verify a successful transmission from the handheld unit to the
receiver.
Wiring Details
Fig. 5 illustrates the terminal assignments of the ZAPP
receiver. Refer to job drawings for specific wiring diagrams.
Connections to the ZAPP receiver are made at an internal
terminal block accessible beneath the front cover. No tools
are required to remove the front cover.
1.
Simply pull away the cover from the sub-base as
shown in Fig. 6.
Use a minimum wire size of 20 AWG (0.5 mm
input/output connections. The maximum length of all
input/output cables is 65 ft (20 m).
Wire to the terminal blocks as follows:
1.
Strip 1/2 in. (13 mm) insulation from the conductor.
2.
Insert the wire in the required terminal location and
tighten the screw to complete the termination.
3.
Ensure that the wire entering the terminal block does
not extend above the numbered face of the terminal
block to avoid contact between the wires and the
printed circuit board on the underside of the front
cover (see Fig. 7).
Control Products
Honeywell Inc.
Honeywell Plaza
P.O. Box 524
Minneapolis, MN 55408-0524
USA
http://www.honeywell.com
EN1B-0166GE51 R0502
7157 409
®
network that allows daisy-
®
network configuration
ORKS
2
) for all
Control Products
Honeywell Limited-Honeywell Limitee
155 Gordon Baker Road
North York, Ontario
M2H 3N7
Canada
http://www.honeywell.ca
printed in Germany
5
6
7
8
Fig. 4. Termination module connection (daisy-chain
network configuration)
24 VAC
120/240 VAC
24 VAC COM
L
W
NETWORK IN
ON
ORKS
L
W
NETWORK OUT
ON
ORKS
Fig. 5. ZAPP receiver terminal assignments
Fig. 6. Terminal cover removal
Fig. 7. Terminal box connections
Control Products
Honeywell AG
Böblinger Straβe 17
D-71101 Schönaich
Germany
http://europe.hbc.honeywell.com
5
6
7
8
BROWN
ORANGE
TERMINATION
MODULE (209541B)
ZAPP RECEIVER
1
24 VAC
2
24 VAC
3
24 VAC
4
24 VAC
5
LonWorks
6
LonWorks
7
LonWorks
8
LonWorks
1
2
3
4
5
6
7
8
9
10
manufacturing location
according to
Subject to change without notice

Advertisement

loading