Maintenance; Safety Information; Weekly Maintenance - Martin DT2S Installation Instructions Manual

Secondary cleaner
Hide thumbs Also See for DT2S:
Table of Contents

Advertisement

6
6.1
6.2
© Martin Engineering GmbH

Maintenance

Safety information

WARNING RISK OF INJURY!
Body parts and/or clothing may get caught and pulled in by
rotating parts or by the moving conveyor belt.
Shut off the power supply to the conveyor system and
accessories and secure it against unauthorised reactivation before
performing any maintenance work.
Use warning signs!
NOTE
Maintenance inspections must be performed at least once a week.
Shorter maintenance intervals may be required depending on the
operating conditions.
NOTE
The item numbers in the pictures correspond to the numbering in
the parts list in Section 9.

Weekly maintenance

1. Shut off the power supplies of the conveyor belt and any
additional equipment and secure them against unauthorised
reactivation.
2. Remove all material deposits from the blade and the
mainframe.
3. Inspect whether all of the fastening parts are securely
tightened. Tighten any loose connections.
4. Check the cleaner force and re-tighten if necessary.
5. Check the blades for wear, damage and missing parts.
39
its
M3687UK-12/17

Advertisement

Table of Contents
loading

Table of Contents